Heritage Decorative Street Lighting and the HRIDAY Scheme: What Engineers Need to Know
Quick Answer: HRIDAY ran from 21 January 2015 to 31 March 2019 in 12 heritage cities with a Rs 500 crore outlay. It is closed; no new projects have been taken up since. Heritage lighting today is guided by local heritage committees, state or ULB budgets, and, near protected monuments, the National Monuments Authority rules under the AMASR Act. The structure of a heritage pole follows the same Indian standards as any pole; only the look needs approval, so start the approval before you place the order.
Key facts
  • HRIDAY launched on 21 January 2015 with a total outlay of Rs 500 crore.
  • The 12 HRIDAY cities: Ajmer, Amaravati, Amritsar, Badami, Dwarka, Gaya, Kanchipuram, Mathura, Puri, Varanasi, Velankanni and Warangal.
  • The mission ended on 31 March 2019; no new projects or cities were taken up after that.
  • Near centrally protected monuments, the first 100 m is a prohibited area and the next 200 m a regulated area under the AMASR Act.
  • Heritage poles use the same structural standards as other poles: IS 2062 steel, IS 875 Part 3 wind loads, IS 4759 galvanizing, IS 456 foundations.
Correction note: the earlier version said HRIDAY ran 2014-19 and was ‘INTACH-advised’ as a rule. HRIDAY launched in January 2015 and ended on 31 March 2019. INTACH is often consulted, but approval authority depends on the city and site. We have also removed the claim that ‘heritage lighting norms continue to govern procurement’ in these cities, which we could not verify.

What HRIDAY was

The National Heritage City Development and Augmentation Yojana was a central sector scheme of the then Ministry of Urban Development. Its idea was simple: fix the civic infrastructure around heritage assets such as ghats, temples and old bazaars, while keeping each city's character. Street lighting, signage, paving and street furniture were part of that.

Where AMRUT and the Smart Cities Mission talked about efficiency and technology, HRIDAY's brief was character. A plain modern pole on a ghat would have missed the point.

The 12 HRIDAY cities and design directions that tend to work

The ‘style direction’ column below is our suggestion based on each city's architecture. It is not a list of approved designs. Every project still needs local approval.

HRIDAY cities (official list) with suggested design directions
CityStateHeritage contextStyle direction that usually suits
AjmerRajasthanDargah precinct, old cityMughal-arch detailing, dark bronze or deep green
AmaravatiAndhra PradeshBuddhist stupa heritageSimple classical forms, cream or stone tones
AmritsarPunjabGolden Temple surroundings, colonial bazaarsLantern-style posts, black or antique finish
BadamiKarnatakaChalukyan rock-cut templesLow, understated poles; sandstone-look tones
DwarkaGujaratCoastal temple townClassical Indian forms; coastal-grade protection
GayaBiharBuddhist circuit, ghatsClassical Indian lanterns, stone-look bases
KanchipuramTamil NaduDravidian temple townDravidian motifs, dark bronze
MathuraUttar PradeshTemple town, ghatsBrass-look lanterns, lotus motifs
PuriOdishaJagannath temple, sea frontOdishan motifs; coastal-grade protection
VaranasiUttar PradeshGhats, temple lanesMulti-arm lanterns, antique brass look
VelankanniTamil NaduCoastal pilgrimage townClassical forms; coastal-grade protection
WarangalTelanganaKakatiya architectureKakatiya-inspired forms, terracotta or stone tones

Structure: same standards as any pole

A heritage pole is still a structure standing on a public road. The rules for strength and durability do not change because it looks old-fashioned.

  • Steel parts to IS 2062; cast iron parts to IS 210.
  • Wind load design to IS 875 Part 3 for the city's basic wind speed, including the lantern, scrolls and finials.
  • Hot-dip galvanizing to IS 4759 for steel shafts.
  • Foundation to IS 456, with the concrete grade matched to the exposure condition.

For the coastal HRIDAY cities (Puri, Dwarka, Velankanni) and any seaside heritage town, the atmosphere is far more corrosive. Specify IP66 luminaires, duplex coating (galvanizing plus powder coat), stainless fasteners, and a higher concrete grade for foundations as IS 456 requires for severe exposure.

Approvals: who says yes?

This depends on the site, so ask early. The common layers are:

Common approval routes for heritage-area lighting
SituationWho usually needs to approveTypical ask
Within 300 m of a centrally protected monumentNational Monuments Authority, through the competent authorityDrawings, site plan, heights; permission before work
Inside a notified heritage precinct of a cityThe city or state heritage conservation committeeDesign renders, sample or prototype, finish details
Temple or trust-managed premisesThe temple trust, plus the ULB for public roadsDesign fit with temple architecture, crowd safety
Ordinary old-city streets without notificationULB engineering departmentNormal tender and technical approval

A process that avoids delays

  1. Check whether the site is inside a prohibited or regulated area, or a notified heritage precinct.
  2. Get 3D renders and precedent photos from at least two suppliers.
  3. Submit the design to the relevant committee early, alongside BOQ preparation, not after.
  4. Build a prototype or sample pole and install it on site for review, if asked.
  5. Get written approval before ordering bulk quantities.
  6. Inspect the first production batch against the approved sample.

Approval commonly takes a few months. Projects that start approvals alongside the BOQ lose little time. Projects that order first and seek approval later often end up with poles in storage.

Heritage-style poles outside heritage cities

You don't need to be in a HRIDAY city to use heritage-style poles. Maharashtra examples include old peth areas in Pune and Nashik, temple approaches at Trimbakeshwar, Pandharpur or Shirdi, and fort-town main streets. The approval layers above only apply inside notified areas; elsewhere it is a normal municipal or private decision.

Working on a heritage precinct? Get renders, a prototype and IS documentation

References

  1. National Heritage City Development and Augmentation Yojana — mission ended 31 March 2019 (Lok Sabha reply) — Ministry of Housing and Urban Affairs (via Minister's office)
  2. HRIDAY scheme overview — 12 cities, Rs 500 crore outlay — PMIDC, Government of Punjab
  3. Heritage City Development and Augmentation Yojana — Wikipedia
  4. Ancient Monuments and Archaeological Sites and Remains (Amendment and Validation) Act, 2010 — prohibited and regulated areas — Government of India / National Monuments Authority
  5. IS 2062 — Hot Rolled Medium and High Tensile Structural Steel — Bureau of Indian Standards
  6. IS 875 (Part 3): 2015 — Design Loads (Other than Earthquake) for Buildings and Structures: Wind Loads — Bureau of Indian Standards
  7. IS 456: 2000 — Plain and Reinforced Concrete, Code of Practice — Bureau of Indian Standards
  8. IS 4759 — Hot-Dip Zinc Coatings on Structural Steel and Other Allied Products — Bureau of Indian Standards
  9. ISO 9223 — Corrosivity of atmospheres — International Organization for Standardization

Frequently Asked Questions

Is the HRIDAY scheme still active?

No. HRIDAY launched on 21 January 2015 and ended on 31 March 2019. No new projects or cities were taken up after that date.

Which are the 12 HRIDAY cities?

Ajmer, Amaravati, Amritsar, Badami, Dwarka, Gaya, Kanchipuram, Mathura, Puri, Varanasi, Velankanni and Warangal.

Do I need permission to install poles near a protected monument?

Near centrally protected monuments, the first 100 m is a prohibited area and the next 200 m is a regulated area under the AMASR Act. Work in these areas needs permission through the competent authority and the National Monuments Authority.

Do heritage poles follow different structural standards?

No. They follow the same standards as other poles, such as IS 2062 for steel, IS 875 Part 3 for wind, IS 4759 for galvanizing and IS 456 for foundations. Only the appearance needs heritage approval.

क्या हेरिटेज स्टाइल पोल किसी भी शहर में लगा सकते हैं?

हाँ। अगर जगह किसी नोटिफाइड हेरिटेज क्षेत्र या स्मारक के पास नहीं है, तो सामान्य नगर पालिका या निजी मंज़ूरी से काम हो जाता है।

हेरिटेज मंजुरीला किती वेळ लागतो?

साधारण काही महिने लागू शकतात. म्हणून BOQ तयार करतानाच डिझाइन मंजुरीसाठी पाठवा, ऑर्डरनंतर नाही.